ETR — Equipment Technology Rental
Temporary Cooling Solutions
Plan temporary HVAC, air distribution and humidity control around the space, operating conditions and project requirements.
Home / Solutions / Temporary Cooling Solutions
Project challenge and solution approach
Temporary cooling may be needed for warehouses, work areas, events and temporary enclosed spaces. The required conditions depend on how the space is used, its size, occupancy and heat sources.
Share the space dimensions and height, current and target conditions if known, available electricity, airflow routes and operating dates. Cooling and air distribution are reviewed together against the project brief.
Space dimensions and use
Provide floor area and ceiling height, or length, width and height. Identify whether the space is a warehouse, work area, event venue or temporary enclosure.
Occupancy and heat sources
Share expected people numbers and known heat sources such as machinery, lighting, sun exposure and frequent door opening. Add any available cooling-load calculation.
Target conditions
State current temperature and required temperature or humidity conditions if specified. If no target is set, describe the activity and the conditions it requires.
Available electricity
Share available supply, connection-point locations and known electrical constraints. Compatibility must be checked against the selected cooling equipment.
Airflow and access
Provide the proposed equipment location, supply and return-air routes, obstructions and delivery access. Mention ventilation or fresh-air requirements where known.
Dates and operating hours
Include the project city, installation window, start date, rental duration and daily operating hours so the scope and equipment availability can be reviewed.
More equipment and services
Explore the relevant equipment and solutions below.
Equipment for your cooling requirement
Review the HVAC, textile air-distribution and dehumidification categories below according to the space and application. Include existing site systems in your enquiry to clarify the connections required.
Final equipment selection and project scope depend on verified requirements and availability.
Plan cooling and air distribution together
Identify the zones needing cooling, possible equipment positions, air routes and electrical supply. Describe existing cooling or ventilation needs so connections and installation requirements can be reviewed within the scope.
Equipment and temporary solutions for requirements across these sectors and project environments.
Space dimensions and use
Occupancy and heat sources
Target conditions
Available electricity
Airflow and access
Dates and operating hours
Industrial & Manufacturing
Warehousing & Logistics
Events & Exhibitions
Commercial Facilities
Contact ETR with the project location, programme and known site requirements.
Project support across Saudi Arabia
Operational locations in Jeddah and Riyadh. Project support across Saudi Arabia is subject to project requirements, logistics, technical requirements, site conditions, rental duration and equipment availability.
Jeddah — Operational location
Riyadh — Operational location
Prepare your cooling quotation brief
Include the project location, space dimensions and height, use and expected occupancy. Add target conditions, heat sources, electricity, access, rental dates and operating hours. Share what you know even if the required capacity has not been selected.
Temporary Cooling Solutions questions
What should I send for a temporary cooling enquiry?
Share the space dimensions and height, intended use, expected occupancy, project location and dates. Add current temperature readings, required conditions, heat sources and available electricity details where known.
Can cooling capacity be selected from floor area alone?
Height, occupancy, heat sources, sun exposure, insulation, door opening and ventilation affect the load. Floor area starts the review; the selection depends on the project information and suitable equipment.
What if I do not know the target temperature or capacity?
Describe how the space is used, the current problem and occupied hours. Send available readings or drawings and identify unknowns so the requirements can be discussed without assuming a capacity or outcome.
What should be confirmed at the site before equipment selection?
Confirm electricity and connection points, equipment positions, supply and return-air paths, and installation and delivery access. Identify ventilation requirements and existing cooling that needs coordination.
How do I request a temporary cooling quotation?
Use Request a Quote and add dimensions, use, site conditions, dates and operating hours in Project Requirements. Equipment categories, availability, transport, installation and accessories are reviewed within the quotation scope.
Request a temporary cooling quotation
Share the project location, space dimensions and height, intended use and rental dates. Add required conditions and available electricity so the scope can be reviewed around your requirements.