Portable Evaporative Cooler
Portacool 36-inch
Approved ETR size category. The actual model and configuration depend on the available unit and project requirements.
Temporary cooling is not a single-unit decision. The intended use, occupied area, heat conditions, ventilation, air distribution, humidity and available power interfaces all shape the project discussion.
Service-specific applications and project considerations
Cooling support can be planned for temporary buildings, work areas, commercial spaces and project environments according to the intended use and site conditions.
Large or operational spaces require attention to heat conditions, airflow paths, operating schedules and the way conditioned air will reach the required zones.
Cooling and ventilation arrangements may incorporate fresh-air requirements where the verified application and site plan call for them.
Packaged or central cooling arrangements may be coordinated with suitable ducted distribution, including fabric air duct solutions where applicable.
Temporary venues and covered spaces need cooling planned with occupancy, opening periods, structure layout, power and air distribution in view.
Industrial dehumidification, temporary power, distribution boards and maintenance support may be considered when they form part of the same verified requirement.
More equipment and services
Include related equipment and supporting systems in the same project enquiry where useful.
ETR can consider connected equipment and support requirements together where they are relevant to the project scope.
Hilton Hotels Jeddah — Package Unit Rental
Temporary package-unit rental provided in Jeddah to support project cooling requirements.
Equipment and services are combined only where they are relevant to the project requirement.
Service planning considers the intended application, operating environment and site requirements.
Equipment and temporary solutions for requirements across these sectors and project environments.
Construction environments
Warehouses and logistics spaces
Events and temporary facilities
Construction & Infrastructure
Industrial & Manufacturing
Events & Exhibitions
Warehousing & Logistics
Commercial Facilities
Contact ETR for project-specific requirements and available configurations.
Operational locations in Jeddah and Riyadh. Project support across Saudi Arabia is subject to project requirements, logistics, technical requirements, site conditions, rental duration and equipment availability.
Jeddah — Operational location
Riyadh — Operational location
ETR provides 36-inch and 48-inch Portacool size categories for suitable portable evaporative-cooling applications. Portacool equipment is evaporative cooling, not refrigerant-based air conditioning.
Portable Evaporative Cooler
Approved ETR size category. The actual model and configuration depend on the available unit and project requirements.
Portable Evaporative Cooler
Approved ETR size category. The actual model and configuration depend on the available unit and project requirements.
Model, CFM, coverage, water consumption and electrical requirements are not inferred from fan diameter alone.
ETR provides packaged and fresh-air packaged cooling units across a range of cooling capacities for temporary project applications. The table below summarizes the currently approved fleet capacity data. Electrical values such as running current, MCA and electrical input are shown only when verified from unit-specific data.
PCU: Packaged Air Conditioning Unit. FPCU: Fresh Air Packaged Conditioning Unit. TR: Ton of Refrigeration. Cooling capacity in kW means thermal cooling capacity, not electrical power consumption.
| Capacity | Type | Thermal Cooling Capacity | Refrigerant* | Voltage* | Phase | Frequency | Approx. Air Flow** |
|---|---|---|---|---|---|---|---|
| 5 TR | PCU | 17.6 kW | R22 / R407C | 220 / 380 V | 3 Ph | 60 Hz | ~2,000 CFM |
| 10 TR | PCU | 35.2 kW | R22 / R407C | 220 / 380 V | 3 Ph | 60 Hz | ~4,000 CFM |
| 15 TR | PCU | 52.8 kW | R22 / R407C | 220 / 380 V | 3 Ph | 60 Hz | ~6,000 CFM |
| 20 TR | PCU | 70.3 kW | R22 / R407C | 220 / 380 V | 3 Ph | 60 Hz | ~8,000 CFM |
| 25 TR | PCU | 87.9 kW | R22 / R407C | 220 / 380 V | 3 Ph | 60 Hz | ~10,000 CFM |
| 30 TR | PCU | 105.5 kW | R22 / R407C | 220 / 380 V | 3 Ph | 60 Hz | ~12,000 CFM |
| 50 TR | FPCU | 175.8 kW | R22 / R407C | 220 / 380 V | 3 Ph | 60 Hz | Design-dependent |
| 60 TR | PCU | 211 kW | R22 / R407C | 220 / 380 V | 3 Ph | 60 Hz | ~24,000 CFM |
| 100 TR | FPCU | 351.7 kW | R22 / R407C | 460 V | 3 Ph | 60 Hz | Design-dependent |
| 120 TR | FPCU | 422 kW | R22 / R407C | 460 V | 3 Ph | 60 Hz | Design-dependent |
PCU
PCU
PCU
PCU
PCU
PCU
FPCU
PCU
FPCU
FPCU
* Refrigerant configurations in the approved fleet data include R22 and R407C. The actual refrigerant depends on the specific unit. Available voltage configurations vary by unit.
** Approximate planning value based on 400 CFM/TR for PCU entries only. Actual airflow depends on the specific unit and operating configuration. FPCU airflow is not calculated using this rule; it is design-dependent.
These cards show only electrical values supported by unit-specific evidence. Running current and electrical input are not inferred from MCA.
Nameplate-verified data
380 V • 3 Phase • 60 Hz
R407C
MCA: 116 A
Nameplate-verified data
380 V • 3 Phase • 60 Hz
R407C
MCA: 136.6 A
Temporary air handling units can support chilled-water and air-distribution applications when coordinated with the cooling system and site requirements. The CFM values below are planning estimates based on approximately 400 CFM/TR, not verified manufacturer ratings.
| Capacity | Estimated Airflow | Data Status |
|---|---|---|
| 20 TR | ~8,000 CFM | Planning estimate — configuration-dependent |
| 40 TR | ~16,000 CFM | Planning estimate — configuration-dependent |
| 60 TR | ~24,000 CFM | Planning estimate — configuration-dependent |
| 100 TR | ~40,000 CFM | Planning estimate — configuration-dependent |
| 200 TR | ~80,000 CFM | Planning estimate — configuration-dependent |
Chilled Water AHU
Estimated airflow: ~8,000 CFM
Configuration-dependent planning value, not a manufacturer rating.
Chilled Water AHU
Estimated airflow: ~16,000 CFM
Configuration-dependent planning value, not a manufacturer rating.
Chilled Water AHU
Estimated airflow: ~24,000 CFM
Configuration-dependent planning value, not a manufacturer rating.
Chilled Water AHU
Estimated airflow: ~40,000 CFM
Configuration-dependent planning value, not a manufacturer rating.
Chilled Water AHU
Estimated airflow: ~80,000 CFM
Configuration-dependent planning value, not a manufacturer rating.
* Actual airflow depends on the unit, coils, fans, static pressure and operating configuration. Unit-specific data must be confirmed before project selection.
Share the project location, space and application, fresh-air requirements, site conditions, operating schedule, available power, air-distribution requirements and expected duration so the appropriate configuration can be reviewed. You can also review air-cooled chiller rental and fabric air duct solutions.
Share the space type and occupied area, intended use, operating schedule, known heat or humidity conditions, ventilation needs, available power information and site access.
Selection starts with the application and site interfaces. Package units, AHUs and portable evaporative-cooling categories serve different arrangements; verified project data is required before confirming equipment.
Not always. PCU airflow shown by ETR is an engineering estimate based on approximately 400 CFM per TR and is labelled as approximate. Unit-specific nameplate data takes precedence when available.
Yes, where the project requires connected cooling, fabric air distribution, generators, cables or distribution boards. Each component must still be defined in the project scope.
A quotation is prepared from the equipment type and capacity, quantity, rental period, project location, transport, installation requirements, required accessories and technical-support scope.
Share the project location, intended application, quantities, required dates, expected rental duration and verified site or technical requirements.