top of page

Equipment Technology Rental

ETR — Equipment Technology Rental

Generator Rental & Temporary Power Solutions in Saudi Arabia

Temporary diesel power generation that can be coordinated with electrical cables and distribution boards according to project requirements.

Home / Equipment / Generator Rental & Temporary Power Solutions

Build temporary power as a coordinated site system

Generator rental supports temporary project power, but the useful scope starts with the application, load information, operating environment, cable routes, distribution approach and access for placement and service.

Service-specific applications and project considerations

Construction-site power

Temporary generation can support work areas, temporary facilities and project activities when the required loads and interfaces are confirmed.

Industrial temporary supply

Industrial enquiries require a clear brief covering operating conditions, equipment interfaces, site procedures and the intended duration of the temporary requirement.

Event and project infrastructure

Event power planning may connect generation with distribution boards, electrical cables and protected crossings across temporary operating areas.

Distribution boards

Temporary distribution boards can form the controlled connection point between generation and project circuits, subject to verified electrical requirements.

Electrical cables and routing

Cable type and routing depend on the verified technical requirement, distance, access routes and how temporary connections will be protected.

Placement and coordination

Site access, operating environment, positioning, interfaces and the wider deployment sequence should be reviewed before equipment selection is confirmed.

More equipment and services

Include related equipment and supporting systems in the same project enquiry where useful.

Related equipment and project solutions

ETR can consider connected equipment and support requirements together where they are relevant to the project scope.

Equipment and services are combined only where they are relevant to the project requirement.

Applications and industries

Service planning considers the intended application, operating environment and site requirements.

Equipment and temporary solutions for requirements across these sectors and project environments.

Construction power

Industrial operations

Event and temporary project power

Construction & Infrastructure

Industrial & Manufacturing

Events & Exhibitions

Energy & Utilities

Mega Projects

Contact ETR for project-specific requirements and available configurations.

Project support across Saudi Arabia

Operational locations in Jeddah and Riyadh. Project support across Saudi Arabia is subject to project requirements, logistics, technical requirements, site conditions, rental duration and equipment availability.

Generator rental for Jeddah projects

ETR's Jeddah operational location supports generator-rental and temporary-power enquiries for construction, industrial and event projects. Final equipment planning depends on verified loads, electrical requirements, site conditions, rental duration and availability.

Jeddah — Operational location

Riyadh — Operational location

Review Saudi Arabia project coverage

Generator Fleet & Recommended Operating Current

ETR provides generator rental options across a range of capacities and engine brands for temporary project power requirements. The table below shows rated three-phase current values at common operating voltages together with ETR's recommended maximum continuous operating current of 75% of rated current.

General fleet configurations: 3 Phase, 220 / 380 / 460 V, 50 / 60 Hz. These are available general fleet configurations; they do not mean every physical generator supports every voltage and frequency combination. The selected unit must be verified for the project.

CapacityBrand220V Rated220V ETR 75%380V Rated380V ETR 75%460V Rated460V ETR 75%
50 kVA Perkins 131 A76 A63 A
70 kVA Perkins 184 A106 A88 A
80 kVA Deutz 210 A122 A100 A
120 kVA Doosan 315 A182 A151 A
200 kVA Caterpillar 525 A304 A251 A
250 kVA Cummins 656 A380 A314 A
270 kVA John Deere 709 A410 A339 A
270 kVA Olympian / CAT 709 A410 A339 A
400 kVA Caterpillar 1,050 A608 A502 A
650 kVA Deutz 1,706 A988 A816 A
650 kVA Caterpillar 1,706 A988 A816 A
650 kVA Doosan 1,706 A988 A816 A
1250 kVA Caterpillar 3,280 A1,899 A1,569 A

50 kVA

Perkins

220V

Rated: 131 A

380V

Rated: 76 A

460V

Rated: 63 A

70 kVA

Perkins

220V

Rated: 184 A

380V

Rated: 106 A

460V

Rated: 88 A

80 kVA

Deutz

220V

Rated: 210 A

380V

Rated: 122 A

460V

Rated: 100 A

120 kVA

Doosan

220V

Rated: 315 A

380V

Rated: 182 A

460V

Rated: 151 A

200 kVA

Caterpillar

220V

Rated: 525 A

380V

Rated: 304 A

460V

Rated: 251 A

250 kVA

Cummins

220V

Rated: 656 A

380V

Rated: 380 A

460V

Rated: 314 A

270 kVA

John Deere

220V

Rated: 709 A

380V

Rated: 410 A

460V

Rated: 339 A

270 kVA

Olympian / CAT

220V

Rated: 709 A

380V

Rated: 410 A

460V

Rated: 339 A

400 kVA

Caterpillar

220V

Rated: 1,050 A

380V

Rated: 608 A

460V

Rated: 502 A

650 kVA

Deutz

220V

Rated: 1,706 A

380V

Rated: 988 A

460V

Rated: 816 A

650 kVA

Caterpillar

220V

Rated: 1,706 A

380V

Rated: 988 A

460V

Rated: 816 A

650 kVA

Doosan

220V

Rated: 1,706 A

380V

Rated: 988 A

460V

Rated: 816 A

1250 kVA

Caterpillar

220V

Rated: 3,280 A

380V

Rated: 1,899 A

460V

Rated: 1,569 A

Three-phase rated current: I = (kVA × 1000) / (√3 × V)
Published values are rounded for information and planning; the formula is not an engineering certification.

Information We Need to Size Your Temporary Power Requirement

  • Operating voltage
  • Estimated connected load
  • Largest motor or starting load, where applicable
  • Required operating duration
  • Project location
  • Cable distance
  • Distribution requirements
  • Critical loads
  • Expected future or additional load

Related ETR Power Solutions

Generators may be coordinated with electrical cables and distribution boards according to project requirements. Accessories are not automatically included; each component must be defined in the project scope.

Generator Rental & Temporary Power Solutions questions

What information is needed to select generator capacity?

Provide the operating voltage and frequency, estimated connected load, largest motor or starting load where applicable, operating duration, cable distance, distribution requirements and any expected future load.

Are the published generator currents manufacturer ratings?

No. The three-phase current values are calculated from kVA and voltage and are rounded for planning. The selected generator nameplate and project electrical requirements must be verified.

What does the ETR 75% guidance mean?

It is ETR operating guidance for typical continuous-load planning, intended to retain operating margin. It is not a manufacturer-certified maximum and does not replace review of starting current, load type, power factor or site conditions.

Can a generator be quoted with cables and distribution boards?

Yes. Cable routes, lengths, distribution boards and protected crossings can be scoped with the generator when required, but accessories are not included automatically.

How is a generator rental quotation prepared?

A quotation is prepared from the equipment type and capacity, quantity, rental period, project location, transport, installation requirements, required accessories and technical-support scope.

Plan a temporary power requirement

Share the project location, intended application, quantities, required dates, expected rental duration and verified site or technical requirements.

You can also contact ETR directly.

info@etrental.com

Call +966 55 864 5511

WhatsApp ETR

bottom of page