20 TR
Thermal cooling capacity: 70.3 kW
Air-Cooled Chiller
Chiller rental can support central or industrial cooling requirements when the project brief identifies the cooled spaces, operating conditions, water-side or air-side interfaces and available power arrangements.
Service-specific applications and project considerations
A temporary chiller arrangement provides a project-specific cooling source that may be coordinated with air-handling, distribution and site interfaces where applicable.
Industrial facilities and commercial environments may require a temporary central cooling discussion around the operating area, process context and site conditions.
Construction, refurbishment and temporary facilities can be assessed when permanent cooling is unavailable or an additional temporary arrangement is required.
Chillers may be discussed with AHU or suitable air-distribution interfaces where the verified project arrangement supports that relationship.
Fabric air duct solutions may be considered when a temporary cooled-air distribution arrangement is part of the project brief.
Generators, electrical cables and distribution boards may be reviewed where temporary power interfaces form part of the same requirement.
More equipment and services
Include related equipment and supporting systems in the same project enquiry where useful.
ETR can consider connected equipment and support requirements together where they are relevant to the project scope.
Equipment and services are combined only where they are relevant to the project requirement.
Service planning considers the intended application, operating environment and site requirements.
Equipment and temporary solutions for requirements across these sectors and project environments.
Industrial process and facility cooling
Temporary central cooling
Commercial and project environments
Industrial & Manufacturing
Construction & Infrastructure
Commercial Facilities
Warehousing & Logistics
Contact ETR for project-specific requirements and available configurations.
Operational locations in Jeddah and Riyadh. Project support across Saudi Arabia is subject to project requirements, logistics, technical requirements, site conditions, rental duration and equipment availability.
Jeddah — Operational location
Riyadh — Operational location
ETR provides air-cooled chillers for temporary cooling and project requirements in Saudi Arabia. The approved table shows thermal cooling capacity; kW here is cooling capacity, not electrical power consumption.
| Capacity | Thermal Cooling Capacity | Type |
|---|---|---|
| 20 TR | 70.3 kW | Air-Cooled Chiller |
| 40 TR | 140.7 kW | Air-Cooled Chiller |
| 60 TR | 211.0 kW | Air-Cooled Chiller |
| 100 TR | 351.7 kW | Air-Cooled Chiller |
| 200 TR | 703.4 kW | Air-Cooled Chiller |
| 210 TR | 738.5 kW | Air-Cooled Chiller |
| 240 TR | 844.1 kW | Air-Cooled Chiller |
Thermal cooling capacity: 70.3 kW
Air-Cooled Chiller
Thermal cooling capacity: 140.7 kW
Air-Cooled Chiller
Thermal cooling capacity: 211.0 kW
Air-Cooled Chiller
Thermal cooling capacity: 351.7 kW
Air-Cooled Chiller
Thermal cooling capacity: 703.4 kW
Air-Cooled Chiller
Thermal cooling capacity: 738.5 kW
Air-Cooled Chiller
Thermal cooling capacity: 844.1 kW
Air-Cooled Chiller
Chillers may be considered with air handling units, air distribution and temporary power when the project system requires them. Review HVAC & Cooling Rental or request a quote with the site, cooling requirement, operating duration and available interface information.
Share the cooled space or process, operating schedule, known water-side or air-side interfaces, available power information, access conditions and expected rental duration.
The project cooling requirement and system interfaces must be reviewed against approved equipment data. Published thermal capacities are not electrical power consumption, and the selected unit nameplate must be verified.
A chiller supplies chilled-water cooling for a compatible system, while a packaged AC unit provides a self-contained air-conditioning arrangement. The existing site interfaces determine which approach is relevant.
They can be discussed where the verified design requires air-side distribution or temporary electrical support. Inclusion is not automatic and each interface must be scoped.
A quotation is prepared from the equipment type and capacity, quantity, rental period, project location, transport, installation requirements, required accessories and technical-support scope.
Share the project location, intended application, quantities, required dates, expected rental duration and verified site or technical requirements.